
Overview
The client's Oil Refinery wanted a place to hold their sludge from their wastewater treatment plant.
Approach
ATI built a concrete sludge drying roughly 1000 sq. m in area.
The client's Oil Refinery wanted a place to hold their sludge from their wastewater treatment plant.
ATI built a concrete sludge drying roughly 1000 sq. m in area.